project-g-8

The Avenues, Phase-II, Al-Rai

    • Commercial Buildings

The Avenues, Phase-II, Al-Rai

Location

Al-Rai

progect-8

Description of Units

2 – Passenger Elevator 1600 Kgs. VVVF 1.00 m/s. 3/3 Stops
2 – Passenger Elevator 1600 Kgs. VVVF 1.00 m/s. 2/2 Stops
1 – Passenger Elevator 1000 Kgs. VVVF 1.00 m/s. 4/4 Stops
1 – Freight Elevator 1600 Kgs. VVVF 1.00 m/s. 3/3 Stops
1 – Freight Elevator 1600 Kgs. VVVF 1.00 m/s. 3/3 Stops
4 – Freight Elevator 1600 Kgs. VVVF 1.00 m/s. 3/3 Stops
6 – Escalators 30 Deg. – 80 K – R.
10 – Escalators 30 Deg. – 80 K – R.
2 – Compaveyors 12 Deg. – 100 K – R – 4,200mm
1 – Goods Elevator, 1000 Kgs., 1.00 M/s., 2/2
1 – Goods Elevator, 1000 Kgs., 1.00 M/s., 3/3
2 – Passenger Elevator 1350 Kgs. VVVF 1.00 m/s. 3/3 Stops
1 – Passenger Elevator 1600 Kgs. VVVF 1.00 m/s. 5/5 Sto

Scroll to Top
Scroll to Top