project-g-8

St. Mark’s Coptic Orthodox Cathedral, Hawally

    • Government Projects

St. Mark’s Coptic Orthodox Cathedral, Hawally

Location

Hawally

progect-8

Description of Units

2 – Passenger Elevator 630 Kgs. 1.00 m/s VVVF Drive 5/5 Stops
4 – Passenger Elevator 1000 Kgs. 1.60 m/s VVVF Drive 5/5 Stops
1 – Dumbwaiter 100 Kgs. 0.40 m/s, APB Drive, 2/2 Stops

Scroll to Top
Scroll to Top